CE_RWLABEXP_VW

(SQL View)
Index Back

Rework Labor Expense

This is the Cost Manager's view for Rework Labor Expense Variance for Variance type 10

SELECT A.BUSINESS_UNIT ,A.PRODUCTION_ID ,A.VARIANCE_TYPE ,A.COMPONENT_ID ,A.ISSUE_QTY ,A.YIELD_QTY ,A.TL_COST ,A.LL_COST ,A.COST_ELEMENT ,B.DESCR ,A.VAR_PRDN_QTY ,A.AOQ ,A.OP_SEQUENCE ,A.WORK_CENTER_CODE ,A.DAILY_CAPACITY ,A.OP_TIME ,A.OP_TIME_UNIT ,A.TIME_TYPE ,A.QTY_ISS_TO_OP ,A.RATE_AMOUNT ,A.RATE_TYPE ,A.OVHD_RATE_CODE ,A.OVERHEAD_PERCENT ,A.OVERHEAD_RATE ,SUM(A.VARIANCE_AMOUNT) ,SUM(A.VARIANCE_AMOUNT3) FROM PS_SF_VARS_DETAIL A , PS_IN_NONATC_VW B WHERE A.BUSINESS_UNIT = B.BUSINESS_UNIT AND A.COST_ELEMENT = B.COST_ELEMENT GROUP BY A.BUSINESS_UNIT ,A.PRODUCTION_ID ,A.VARIANCE_TYPE ,A.COMPONENT_ID ,A.ISSUE_QTY ,A.YIELD_QTY ,A.TL_COST ,A.LL_COST ,A.COST_ELEMENT ,B.DESCR ,A.VAR_PRDN_QTY ,A.AOQ ,A.OP_SEQUENCE ,A.WORK_CENTER_CODE ,A.DAILY_CAPACITY ,A.OP_TIME ,A.OP_TIME_UNIT ,A.TIME_TYPE ,A.QTY_ISS_TO_OP ,A.RATE_AMOUNT ,A.RATE_TYPE ,A.OVHD_RATE_CODE ,A.OVERHEAD_PERCENT ,A.OVERHEAD_RATE

# PeopleSoft Field Name PeopleSoft Field Type Database Column Type Description
1 BUSINESS_UNIT Character(5) VARCHAR2(5) NOT NULL Business Unit
2 PRODUCTION_ID Character(10) VARCHAR2(10) NOT NULL Production ID
3 VARIANCE_TYPE Character(2) VARCHAR2(2) NOT NULL 9/9/02 CRC: added variance type '15' for Yield Variance
01=Configuration Variance
02=Usage Variance
03=Component Yield Variance
04=Labor Lot Size Variance
05=Process Routing Variance
06=Efficiency Variance
07=Rate Variance
08=Material Lot Size Variance
09=Rework Expense
10=Rework Labor Expense
11=Outside Processing PPV
12=Mix Variance
13=Teardown Material Expense
14=Teardown Conversion Expense
15=Yield Variance
16=Co-Product Rate Var
17=Material Rate Variance
4 COMPONENT_ID Character(18) VARCHAR2(18) NOT NULL 04/10/00 (Internet Architecture) SCC: Uppercase label Id.
5 ISSUE_QTY Number(12,4) DECIMAL(11,4) NOT NULL 07/28/99 SCC CN#SF800-9.0: Added label id TO_ISSUE_QTY
6 YIELD_QTY Number(12,4) DECIMAL(11,4) NOT NULL 10/12/99 SCC CN#SF800-9.0: Added label id TO_YIELD_QTY
7 TL_COST Number(15,4) DECIMAL(14,4) NOT NULL This Level Cost
8 LL_COST Number(15,4) DECIMAL(14,4) NOT NULL Lower Level Cost
9 COST_ELEMENT Character(4) VARCHAR2(4) NOT NULL Cost Element
10 DESCR Character(30) VARCHAR2(30) NOT NULL Description
11 VAR_PRDN_QTY Signed Number(13,4) DECIMAL(11,4) NOT NULL Variance Production Quantity This field was created on 05/06/2010 and will be used by the Variance Drilldown inquiry to show how Configuration variance and Material Lot Size variance are calculated during the Production Close. If the user has selected to close Production with remaining assemblies, then this field will be the sum of SF_PRDNID_HEADR.COMPLETED_QTY & SCRAP_QTY. Otherwise, it will be set to the value of SF_PRDNID_HEADR.NEW_PRDN_QTY.
12 AOQ Signed Number(17,4) DECIMAL(15,4) NOT NULL Average Order Qty
13 OP_SEQUENCE Number(4,0) SMALLINT NOT NULL Operation Sequence
14 WORK_CENTER_CODE Character(10) VARCHAR2(10) NOT NULL Work Center
15 DAILY_CAPACITY Number(5,2) DECIMAL(4,2) NOT NULL Average Daily Hours
16 OP_TIME Number(9,2) DECIMAL(8,2) NOT NULL Op Time
17 OP_TIME_UNIT Character(2) VARCHAR2(2) NOT NULL Time Unit
DY=Days
HR=Hours
MN=Minutes
18 TIME_TYPE Character(4) VARCHAR2(4) NOT NULL Time / Resource Type
0100=Planning Labor Setup
0200=Planning Labor Fixed Run
0300=Planning Labor Run
0400=Planning Labor Post Prod
0500=Planning Machine Setup
0600=Planning Machine Fixed Run
0700=Planning Machine Run
0800=Planning Machine Post Prod
1100=Costing Labor Setup
1200=Costing Labor Fixed Run
1300=Costing Labor Run
1400=Costing Labor Post Prod
1500=Costing Machine Setup
1600=Costing Machine Fixed Run
1700=Costing Machine Run
1800=Costing Machine Post Prod
2000=Queue Time
3000=Intransit Time
19 QTY_ISS_TO_OP Number(12,4) DECIMAL(11,4) NOT NULL Quantity Issued to Operation
20 RATE_AMOUNT Number(11,4) DECIMAL(10,4) NOT NULL Rate Amount
21 RATE_TYPE Character(2) VARCHAR2(2) NOT NULL Rate Per
HR=Hourly
UN=Per Unit
22 OVHD_RATE_CODE Character(4) VARCHAR2(4) NOT NULL Conversion Ovhd Rate Code
23 OVERHEAD_PERCENT Number(5,1) DECIMAL(4,1) NOT NULL Conversion Overhead %
24 OVERHEAD_RATE Number(11,4) DECIMAL(10,4) NOT NULL Conversion Overhead Rate
25 VARIANCE_AMOUNT Signed Number(16,4) DECIMAL(14,4) NOT NULL Variance Amount
26 VARIANCE_AMOUNT3 Signed Number(18,6) DECIMAL(16,6) NOT NULL Variance Amount with decimal precision of 6 used by Variance Drilldown.