INTFC_ACT_GEN

(SQL Table)
Index Back

Project Resource Interface

Project Resource Interface

  • Parent record: PROJ_ACTIVITY
  • # PeopleSoft Field Name PeopleSoft Field Type Database Column Type Description
    1 INTFC_ID Number(8,0) INTEGER NOT NULL Interface ID
    2 INTFC_LINE_NUM Number(8,0) INTEGER NOT NULL Interface Line Number
    3 BUSINESS_UNIT Character(5) VARCHAR2(5) NOT NULL Business Unit

    Prompt Table: SP_BU_PC_NONVW

    4 PROJECT_ID Character(15) VARCHAR2(15) NOT NULL Project Id ChartField
    5 ACTIVITY_ID Character(15) VARCHAR2(15) NOT NULL Activity ID
    6 INTFC_TYPE Character(3) VARCHAR2(3) NOT NULL Trans Load Type
    7 INTFC_STATUS Character(3) VARCHAR2(3) NOT NULL Interface Status
    CON=Consolidated
    DON=Mass Changes Generated
    ERR=Error
    NEW=Mass Changes Not Generated
    REP=Replaced by Other Records (AP)
    UNI=Unitized

    Default Value: NEW

    8 LOAD_STATUS Character(3) VARCHAR2(3) NOT NULL /* -> JMZ. PSOFT. 11-OCT-2002 */ New Status were added : HLD and INP for Asset Management. /* <- JMZ. PSOFT. 11-OCT-2002 */
    CON=Consolidated
    DON=Loaded
    ERR=Errored
    EXC=Excluded
    HLD=On Hold
    INP=In Process
    NEW=Pending
    PGI=PO Grp Incomplete
    REP=Replaced
    UNI=Unitized

    Default Value: NEW

    9 ORIG_INTFC_ID Number(8,0) INTEGER NOT NULL Original Interface ID
    10 ORIG_LINE_NUM Number(8,0) INTEGER NOT NULL Original Interface Line Number
    11 ACTIVITY_DESCR Character(30) VARCHAR2(30) NOT NULL Activity Description
    12 ACTIVITY_TYPE Character(5) VARCHAR2(5) NOT NULL Activity Type
    A=Activity Type
    E=Entry Type
    G=Group Type/Origin
    O=Activity Type/Origin
    R=Entry Type/Reason

    Prompt Table: PROJ_ACT_TBL

    13 SYSTEM_SOURCE Character(3) VARCHAR2(3) NOT NULL Identifies the application or source system that generated a journal entry. Release 8.80 - 11/14/2002 - RVlasic - Removed GDM (JrnlGen - Deduction Management) from Translate Values. SUJ---Included a label as Product. Release 8.9 - 05/11/2005 - RVlasic - Added PRV (Variance Pricing) and PKK (KK Budget Journal) and deleted GLK for Project Costing per Brian Cohen.

    Default Value: BPC

    14 PERCENT_COMPLETE Number(6,2) DECIMAL(5,2) NOT NULL % Complete
    15 EARLY_START_DT Date(10) DATE Early Start Date
    16 LATE_START_DT Date(10) DATE Late Start Date
    17 ACTUAL_START_DT Date(10) DATE Actual Start Date
    18 EARLY_FINISH_DT Date(10) DATE Early Finish Date
    19 LATE_FINISH_DT Date(10) DATE Late Finish Date
    20 ACTUAL_FINISH_DT Date(10) DATE Actual Finish Date
    21 BASELINE_FINISH_DT Date(10) DATE Baseline Finish Date
    22 BASELINE_START_DT Date(10) DATE Baseline Start Date
    23 BCWP Number(3,0) SMALLINT NOT NULL BCWP - Worked Performed
    24 BCWS Number(3,0) SMALLINT NOT NULL BCWS Work Scheduled
    25 ACT_TYPE_SCH Character(5) VARCHAR2(5) NOT NULL Schedule Activity Type

    Prompt Table: PC_ACT_TYPE_SCH

    26 DTTM_STAMP DateTime(26) TIMESTAMP Specifies the date and time of the last update to an entry. This field is maintained by PeopleSoft and is used in a variety of contexts.
    27 DRAWING_NAME Character(8) VARCHAR2(8) NOT NULL Drawing Name
    28 ACTIVITY_USER1 Character(10) VARCHAR2(10) NOT NULL User 1
    29 ACTIVITY_USER2 Character(10) VARCHAR2(10) NOT NULL User 2
    30 ACTIVITY_USER3 Character(10) VARCHAR2(10) NOT NULL User 3
    31 ACTIVITY_USER4 Character(10) VARCHAR2(10) NOT NULL User 4
    32 ACTIVITY_USER5 Character(10) VARCHAR2(10) NOT NULL User 5
    33 PC_ACT_USER_DT1 Date(10) DATE Date 1
    34 PC_ACT_USER_DT2 Date(10) DATE Date 2
    35 PC_USER_CURRENCY Character(3) VARCHAR2(3) NOT NULL User Currency

    Prompt Table: CURRENCY_CD_TBL

    36 PC_ACT_USERAMT1 Signed Number(17,2) DECIMAL(15,2) NOT NULL Amount 1
    37 PC_ACT_USERAMT2 Signed Number(17,2) DECIMAL(15,2) NOT NULL Amount 2
    38 PC_ACT_USERAMT3 Signed Number(17,2) DECIMAL(15,2) NOT NULL Amount 3
    39 SETID Character(5) VARCHAR2(5) NOT NULL SetID

    Prompt Table: SETID_TBL

    40 OPRID Character(30) VARCHAR2(30) NOT NULL A user's ID (see PSOPRDEFN).
    41 PROCESS_INSTANCE Number(10,0) DECIMAL(10) NOT NULL Process Instance
    42 DESCR254 Character(254) VARCHAR2(254) NOT NULL Description of length 254
    43 ACT_LOC_EFFDT Date(10) DATE Activity Location Effdt

    Default Value: %date

    44 EFFSEQ Number(3,0) SMALLINT NOT NULL Effective Sequence

    Default Value: 1

    45 LOCATION Character(10) VARCHAR2(10) NOT NULL Location Code

    Default Value: LOCATION_TBL.LOCATION

    Prompt Table: LOCATION_TBL

    46 LOCATION_FRACTION Number(4,2) DECIMAL(3,2) NOT NULL Fraction of Cost at Location

    Default Value: 1

    47 ACTIVITY_STATUS Character(1) VARCHAR2(1) NOT NULL Activity Status

    Prompt Table: PROJ_STATUS_TBL

    48 ACT_STATUS_EFFDT Date(10) DATE Activity Status Effective Date

    Default Value: %date

    49 START_DT_2 Date(10) DATE Start Date
    50 END_DT_2 Date(10) DATE End Date
    51 START_DT Date(10) DATE NOT NULL Start Date

    Default Value: %Date

    52 END_DT Date(10) DATE NOT NULL End Date

    Default Value: %Date

    53 ACTIVITY_PRIORITY Number(3,0) SMALLINT NOT NULL Activity Priority
    54 ACT_PCT_COMPLETE Number(6,2) DECIMAL(5,2) NOT NULL Percent Complete
    55 QUALITY_DTTM DateTime(26) TIMESTAMP Quality Date
    56 QUALITY_TYPE Character(3) VARCHAR2(3) NOT NULL Quality Type

    Prompt Table: PROJ_QUAL_TBL

    57 QUALITY_RATING Number(3,0) SMALLINT NOT NULL Quality Rating
    58 QUALITY_WEIGHT Number(3,0) SMALLINT NOT NULL Quality Weighting
    59 QUALITY_MEMBER Character(11) VARCHAR2(11) NOT NULL Quality Team Member

    Prompt Table: PROJ_TEAM_VW

    60 COUNTRY Character(3) VARCHAR2(3) NOT NULL Country

    Prompt Table: COUNTRY_TBL

    61 ADDRESS1 Character(55) VARCHAR2(55) NOT NULL Address 1
    62 ADDRESS2 Character(55) VARCHAR2(55) NOT NULL Address 2
    63 ADDRESS3 Character(55) VARCHAR2(55) NOT NULL Address 3
    64 ADDRESS4 Character(55) VARCHAR2(55) NOT NULL Address 4
    65 CITY Character(30) VARCHAR2(30) NOT NULL City
    66 NUM1 Character(6) VARCHAR2(6) NOT NULL Number 1
    67 NUM2 Character(6) VARCHAR2(6) NOT NULL Number 2
    68 HOUSE_TYPE Character(2) VARCHAR2(2) NOT NULL House Type
    AB=House Boat
    WW=Trailer
    69 ADDR_FIELD1 Character(2) VARCHAR2(2) NOT NULL Address Field 1
    70 ADDR_FIELD2 Character(4) VARCHAR2(4) NOT NULL Address Field 2
    71 ADDR_FIELD3 Character(4) VARCHAR2(4) NOT NULL Address Field 3
    72 COUNTY Character(30) VARCHAR2(30) NOT NULL County
    73 STATE Character(6) VARCHAR2(6) NOT NULL State

    Prompt Table: %EDIT_STATE

    74 POSTAL Character(12) VARCHAR2(12) NOT NULL Postal
    75 GEO_CODE Character(11) VARCHAR2(11) NOT NULL Geo Code
    76 IN_CITY_LIMIT Character(1) VARCHAR2(1) NOT NULL In City Limit

    Y/N Table Edit

    77 RATE_PLAN Character(15) VARCHAR2(15) NOT NULL Rate Plan - A Rate Plan will allow rate sets to be stacked on top of each other so that the output from one rate set can be used to create additional output from the next rate set. Rate Plans will replace existing Burden Plans in release 8.9. A Rate Plan could be tied to Project Type, Project, Activity or Contract line.
    78 PC_MILESTONE_FLG Character(1) VARCHAR2(1) NOT NULL Milestone Activity
    N=No
    Y=Yes

    Y/N Table Edit

    79 AFUDC_ACT_SW Character(1) VARCHAR2(1) NOT NULL Allow AFUDC Calculation

    Y/N Table Edit

    80 ACT_TEMPLATE_SW Character(1) VARCHAR2(1) NOT NULL Use Activity as Template

    Y/N Table Edit

    81 PC_SCH_FIELD1 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    82 PC_SCH_FIELD2 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    83 PC_SCH_FIELD3 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    84 PC_SCH_FIELD4 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    85 PC_SCH_FIELD5 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    86 PC_SCH_FIELD6 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    87 PC_SCH_FIELD7 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
    88 SUMMARY_ACT Character(1) VARCHAR2(1) NOT NULL Flag to indicate whether an activity is summary or detail.
    N=Detail Activity
    Y=Summary Activity

    Default Value: N

    89 PC_DURATION Number(11,2) DECIMAL(10,2) NOT NULL Duration
    90 ENFORCE Character(1) VARCHAR2(1) NOT NULL Enforce project team based prompt. Besides the defined translate values, this field is updated with a value of 'N' when team is not enforced in any of the products.
    E=Expenses
    N=No
    T=Time&Labor
    Y=Exp and TL
    91 PC_CHC_ACT_SW Character(1) VARCHAR2(1) NOT NULL Enable Change Control

    Default Value: PROJECT.PC_CHC_SW

    92 PGM_SCHED_METHOD Character(1) VARCHAR2(1) NOT NULL The method to be used for Project Scheduling. Valid methods are: Fixed Units, Fixed Duration, and Fixed Work
    D=Fixed Duration
    U=Fixed Units
    W=Fixed Work

    Default Value: PROJECT.PGM_SCHED_METHOD

    93 WBS_ID Character(100) VARCHAR2(100) NOT NULL WBS ID
    94 LEVEL1 Number(5,0) INTEGER NOT NULL Level 1
    95 LEVEL2 Number(5,0) INTEGER NOT NULL Level 2
    96 LEVEL3 Number(5,0) INTEGER NOT NULL Level 3
    97 LEVEL4 Number(5,0) INTEGER NOT NULL Level 4
    98 LEVEL5 Number(5,0) INTEGER NOT NULL Level 5
    99 LEVEL6 Number(5,0) INTEGER NOT NULL Level 6
    100 LEVEL7 Number(5,0) INTEGER NOT NULL Level 7
    101 LEVEL8 Number(5,0) INTEGER NOT NULL Level 8
    102 LEVEL9 Number(5,0) INTEGER NOT NULL Level 9
    103 LEVEL10 Number(5,0) INTEGER NOT NULL Level 10
    104 LEVEL11 Number(5,0) INTEGER NOT NULL Level 11
    105 LEVEL12 Number(5,0) INTEGER NOT NULL Level 12
    106 LEVEL13 Number(5,0) INTEGER NOT NULL Level 13
    107 LEVEL14 Number(5,0) INTEGER NOT NULL Level 14
    108 LEVEL15 Number(5,0) INTEGER NOT NULL Level 15
    109 LEVEL16 Number(5,0) INTEGER NOT NULL Level 16
    110 LEVEL17 Number(5,0) INTEGER NOT NULL Level 17
    111 LEVEL18 Number(5,0) INTEGER NOT NULL Level 18
    112 LEVEL19 Number(5,0) INTEGER NOT NULL Level 19
    113 LEVEL20 Number(5,0) INTEGER NOT NULL Level 20
    114 LEVEL21 Number(5,0) INTEGER NOT NULL Level 21
    115 LEVEL22 Number(5,0) INTEGER NOT NULL Level 22
    116 LEVEL23 Number(5,0) INTEGER NOT NULL Level 23
    117 LEVEL24 Number(5,0) INTEGER NOT NULL Level 24
    118 LEVEL25 Number(5,0) INTEGER NOT NULL Level 25
    119 LEVEL26 Number(5,0) INTEGER NOT NULL Level 26
    120 LEVEL_NUM Number(3,0) SMALLINT NOT NULL Level
    121 ROW_NUMBER_5 Number(5,0) INTEGER NOT NULL Row Number
    122 DEADLINE_DT Date(10) DATE Deadline Date
    123 CONSTRAINT_DT Date(10) DATE Constraint Date
    124 CONSTRAINT_TYPE Character(4) VARCHAR2(4) NOT NULL Constraint Type
    ALAP=As Late As Possible
    ASAP=As Soon As Possible
    ENET=End No Earlier Than
    ENLT=End No Later Than
    MEO=Must End On
    MSO=Must Start On
    SNET=Start No Earlier Than
    SNLT=Start No Later Than
    125 COSTING_ACT_SW Character(1) VARCHAR2(1) NOT NULL Activity Costing Switch - determines whether an activity is available for charging. 'Y' = charging is allowed; 'N' = charging is not allowed.
    126 PC_ACT_OWNER Character(11) VARCHAR2(11) NOT NULL Activity Owner - The employee id of the individual who is responsible for the execution of an activity or a group of activities.

    Prompt Table: PC_TEAM_PROM_VW

    127 CURRENCY_CD Character(3) VARCHAR2(3) NOT NULL Currency Code

    Default Value: PROJECT.CURRENCY_CD

    128 PC_ACT_DEF_CALC_MT Character(1) VARCHAR2(1) NOT NULL Activity Calculation Method
    D=Duration
    E=End Date
    S=Start Date

    Default Value: PROJECT.PC_ACT_DEF_CALC_MT

    129 PARTICIPATING Character(1) VARCHAR2(1) NOT NULL Participating

    Y/N Table Edit

    Default Value: Y

    130 PROJECT_OBJECTID Number(10,0) DECIMAL(10) NOT NULL A unique ID that is the Project key to a corresponding table in an external system such as Primavera.
    131 ACTIVITY_OBJECTID Number(10,0) DECIMAL(10) NOT NULL A unique ID that is the Activity key to a corresponding table in an external system such as Primavera.
    132 NEW_NEXTID Character(1) VARCHAR2(1) NOT NULL Indicator that a new "next" ID was assigned.
    133 ERR_REASON Character(3) VARCHAR2(3) NOT NULL Reason code for error
    ACT=Activity Error
    DUP=Duplicate
    EDT=Invalid Field Value
    PRJ=Project Error
    REQ=Required Field Missing
    SUM=Resource at Summary Activity
    134 P6_WBS_FLAG Character(1) VARCHAR2(1) NOT NULL A flag, when set to Y(es) indicates that an activity originated from a Primavera WBS.
    N=Activity
    Y=Work Breakdown Structure
    135 P6_ACTIVITY_GUID Character(36) VARCHAR2(36) NOT NULL P6 ACTIVITY GUID