# PeopleSoft Field Name PeopleSoft Field Type Database Column Type Description
1 PC_MSP2_SERVER Character(64) VARCHAR2(64) NOT NULL Microsoft Project Server

Prompt Table: PC_MSP2_SERV_VW

2 SESSION_NAME Character(50) VARCHAR2(50) NOT NULL MSP Integrator Session Name - name given by the Windows Terminal Service session.
3 PC_MSP2_STATUS Character(3) VARCHAR2(3) NOT NULL MSP Integrator Status: Waiting = idle Working = currently integrating Absent = no longer responding Error = error occurred and no longer workable. Pause = keep the integrator from processing
ABS=Absent
ERR=Error
PS=Hold
WK=Busy
WT=Waiting
4 PC_MSP2_PRIORITY Number(3,0) SMALLINT NOT NULL Priority
5 LASTUPDDTTM DateTime(26) TIMESTAMP Specifies the date and time of the last update to an entry. This field is maintained by PeopleSoft and is used in a variety of contexts.
6 PC_SYNC_DIR Character(3) VARCHAR2(3) NOT NULL Sync direction for MSP Integration. CMS = Copy to Microsoft CPS = Copy to PeopleSoft UMS = Update Microsoft UPS = Upgrade PeopleSoft UPR = Get Update from Project Resource List (PRL)
CMS=Copy Project to Microsoft
CPS=Copy Project to PeopleSoft
UMS=Update Project in Microsoft
UPR=Project Resource List Update
UPS=Update Project in PeopleSoft
7 PC_FILE_PATH Character(254) VARCHAR2(254) NOT NULL .mpp File Path
8 PC_SCH_3D_PROJECT Character(40) VARCHAR2(40) NOT NULL Third Party Projects
9 RUN_CNTL_ID Character(30) VARCHAR2(30) NOT NULL Run Control ID
10 OPRID Character(30) VARCHAR2(30) NOT NULL A user's ID (see PSOPRDEFN).
11 BUSINESS_UNIT Character(5) VARCHAR2(5) NOT NULL Business Unit

Prompt Table: SP_BU_PC_NONVW

12 PROJECT_ID Character(15) VARCHAR2(15) NOT NULL Project Id ChartField

Prompt Table: SP_PROJ_NONVW

13 PROJECT_ID_2 Character(15) VARCHAR2(15) NOT NULL Project
14 PASSWORD Character(254) VARCHAR2(254) NOT NULL Password
15 PROJ_DESCR Character(30) VARCHAR2(30) NOT NULL Project ID Description
16 PROJECT_STATUS Character(1) VARCHAR2(1) NOT NULL Project Status
B=Budgeted
C=Closed
H=Hold
O=Open
P=Proposed

Prompt Table: PROJ_STATUS_TBL

17 PROJECT_TYPE Character(5) VARCHAR2(5) NOT NULL Project Type
A=Activity
G=Grant
H=Phase
P=Project
S=Segment

Prompt Table: PROJ_TYPE_TBL

18 EFF_STATUS Character(1) VARCHAR2(1) NOT NULL Effective Status
A=Active
I=Inactive
19 INTEGRATION_TMPL Character(15) VARCHAR2(15) NOT NULL Integration

Prompt Table: PC_INT_TMPL

20 PC_HTDOCROOT Character(30) VARCHAR2(30) NOT NULL HTTP Document Root
21 FTP_SERVER Character(254) VARCHAR2(254) NOT NULL FTP Server Name
22 IN_USE_FLAG Character(1) VARCHAR2(1) NOT NULL Row in use flag

Default Value: N

23 PC_SCHEDULE_TYPE Character(1) VARCHAR2(1) NOT NULL Schedule From Start?
N=Schedule from End Date
Y=Schedule from Start Date
24 ATTACHUSERFILE Character(64) VARCHAR2(64) NOT NULL Attached File
25 PC_UPLOAD Character(1) VARCHAR2(1) NOT NULL Add .mpp file
26 PC_MSP_OVERWRITE Character(1) VARCHAR2(1) NOT NULL Overwrite Existing Data
N=No
Y=Yes

Default Value: N

27 PC_MSP_DELETE Character(1) VARCHAR2(1) NOT NULL Delete Existing Activities
N=No
Y=Yes

Default Value: N

28 PC_MSP_DEL_RES Character(1) VARCHAR2(1) NOT NULL Delete Existing Transactions
N=No
Y=Yes
29 TREE_NAME Character(18) VARCHAR2(18) NOT NULL Tree Name

Prompt Table: PC_TREESTRCT_VW

30 TREE_EFFDT Date(10) DATE Effective date of the Tree

Prompt Table: PC_TREE_EFDT_VW

31 PARENT_NODE Character(20) VARCHAR2(20) NOT NULL Parent Tree Node

Prompt Table: PC_TREE_NODE_VW

32 PC_WBS_ID Character(20) VARCHAR2(20) NOT NULL This is the Projects WBS id. It is longer than the previous WBS_ID field. This field will replace the old WBS_ID field in the next major release.
33 PC_WBS_TREE_DESCR Character(30) VARCHAR2(30) NOT NULL WBS Tree Description
34 PC_WBS_TREE_EFDT Date(10) DATE WBS Tree Effective Date
35 PC_WBS_TREE_NEW Character(18) VARCHAR2(18) NOT NULL New WBS Tree Name
36 PC_WBS_TREE_SYN Character(18) VARCHAR2(18) NOT NULL WBS Tree Name
37 PC_WBS_TR_EFDT_NEW Date(10) DATE WBS Tree Effective Date
38 SCH_ACT_GRP Character(5) VARCHAR2(5) NOT NULL Actuals =

Prompt Table: PROJ_AN_GRP_TBL

39 SCH_BUD_GRP Character(5) VARCHAR2(5) NOT NULL Budgets =

Prompt Table: PROJ_AN_GRP_TBL

40 SCH_FTC_GRP Character(5) VARCHAR2(5) NOT NULL Forecasts =

Prompt Table: PROJ_AN_GRP_TBL

41 SCH_INBOUND_BUD Character(5) VARCHAR2(5) NOT NULL Budget Analysis Type

Prompt Table: PC_MSP2_BUD_VW

42 SCH_INBOUND_FTC Character(5) VARCHAR2(5) NOT NULL Forecast Analysis Type

Prompt Table: PROJ_ANTYPE_TBL

43 SCH_OUTBOUND_ACT Character(5) VARCHAR2(5) NOT NULL Outbound Actuals Analysis Type

Prompt Table: PROJ_AN_GRP_TBL

44 SCH_AN_TYPE_FTC_SW Character(1) VARCHAR2(1) NOT NULL Analysis Type Forecast
N=No
Y=Yes

Default Value: N

45 SCH_AN_GRP_MAP_SW Character(1) VARCHAR2(1) NOT NULL OutBound Analysis Group Map
N=No
Y=Yes

Default Value: Y

46 ANALYSIS_GROUP Character(5) VARCHAR2(5) NOT NULL Analysis Group

Prompt Table: PROJ_AN_GRP_TBL

47 BUDG_ANALYSIS_GRP Character(5) VARCHAR2(5) NOT NULL Budget Analysis Group

Prompt Table: PROJ_AN_GRP_TBL

48 PC_TEMPLATE_ID Character(15) VARCHAR2(15) NOT NULL Rate Template ID
49 SCH_DEF_PRJ_INACT Character(1) VARCHAR2(1) NOT NULL Default Project to Inactive
N=No
Y=Yes

Default Value: Y

50 SCH_DEF_ACT_INACT Character(1) VARCHAR2(1) NOT NULL Default Activities to Inactive

Default Value: Y

51 PC_CUST_PROJ_ID Character(1) VARCHAR2(1) NOT NULL Allow user to define their own project id - if blank, then the system defaults to "NEXT".
N=No
Y=Yes
52 PC_SCH_SYN_ACT Character(1) VARCHAR2(1) NOT NULL Synchronize Activity Information flag.
N=No
Y=Yes
53 PC_SCH_SYN_PRJ Character(1) VARCHAR2(1) NOT NULL Synchronize Project Information flag.
N=No
Y=Yes
54 PC_SCH_SYN_RES Character(1) VARCHAR2(1) NOT NULL Synchronize Resources Information flag.
N=No
Y=Yes
55 PC_SCH_SYN_ROLE Character(1) VARCHAR2(1) NOT NULL Roles for Third Party Integration
N=No
Y=Yes
56 PC_SCH_SYN_RST Character(1) VARCHAR2(1) NOT NULL Synchronize Resource Pool/Dictionary Information flag.
N=No
Y=Yes
57 MSP_PROJRSCLABOR Character(1) VARCHAR2(1) NOT NULL Integrate Project Resource List Labor

Y/N Table Edit

58 MSP_PROJRSCMTRIAL Character(1) VARCHAR2(1) NOT NULL Integrate Project Resource List Material

Y/N Table Edit

59 PC_SCH_SYN_ACTRST Character(1) VARCHAR2(1) NOT NULL Synchronize Resource Pool/Dictionary Information flag.
N=No
Y=Yes
60 MSP_ACTRSCLABOR Character(1) VARCHAR2(1) NOT NULL Integrate Activity Resource List Labor

Y/N Table Edit

61 MSP_ACTRSCMTRIAL Character(1) VARCHAR2(1) NOT NULL Integrate Activity Resource List Material

Y/N Table Edit

62 PC_SCH_SYN_WBS Character(1) VARCHAR2(1) NOT NULL Synchronize Activity WBS Information flag.
N=No
Y=Yes
63 PC_PERCENT_COM_FLG Character(1) VARCHAR2(1) NOT NULL Percent Complete
N=No
Y=Yes
64 PC_PCTCOM_PRJ_FLG Character(1) VARCHAR2(1) NOT NULL Percent Complete
N=No
Y=Yes
65 PC_DATE Character(1) VARCHAR2(1) NOT NULL Date
N=No
Y=Yes

Default Value: Y

66 PC_MILESTONE_FLG Character(1) VARCHAR2(1) NOT NULL Milestone Activity
N=No
Y=Yes

Default Value: Y

67 MSP_ACTCOSTLVLWBS Number(3,0) SMALLINT NOT NULL Integrate only costing level WBS
68 PC_DURATION_SW Character(1) VARCHAR2(1) NOT NULL MSP Integration. Copy Durations switch.
N=No
Y=Yes
69 PC_SYNC_WORK Character(1) VARCHAR2(1) NOT NULL Work Entered in Microsoft
N=No
Y=Yes
70 CALENDAR_ID Character(2) VARCHAR2(2) NOT NULL Calendar ID

Prompt Table: CAL_DEFN_TB4_VW

71 PC_SYNC_ETC Character(1) VARCHAR2(1) NOT NULL Estimate To Completion
N=No
Y=Yes

Default Value: Y

72 PC_MSP2_BUD_SOURCE Character(1) VARCHAR2(1) NOT NULL Used to select the source of the Budget Rows from MSP: Task.Cost Task.BaselineCost Resource.Cost Resource.BaselineCost
1=Task.Cost
2=Task.BaselineCost
3=Resource.Cost
4=Resource.BaselineCost
73 PC_MSP2_FTC_SOURCE Character(1) VARCHAR2(1) NOT NULL Used to select the source of Forecast to Complete values: Task Resource
1=Task.RemainingCost
2=Resource.RemainingCost
74 PC_MSP2_ETC_SOURCE Character(1) VARCHAR2(1) NOT NULL Used to select source of Estimate To Completion from MSP: Task.RemainingWork Resource.RemainingWork
1=Task.RemainingWork
2=Resource.RemainingWork
75 PC_SYNC_PRL Character(1) VARCHAR2(1) NOT NULL Project Resource List
N=No
Y=Yes

Default Value: N

76 PC_ASSIGNMENTS Character(1) VARCHAR2(1) NOT NULL Group box label. Also, for MSP Integration, Checkbox for Proj Team Assignments
N=No
Y=Yes
77 PC_PR_SCHED_FIELDS Character(1) VARCHAR2(1) NOT NULL Used in MSP Integration Wizard to flag scheduling fields to be copied or not.
N=No
Y=Yes

Default Value: Y

78 PC_AC_SCHED_FIELDS Character(1) VARCHAR2(1) NOT NULL Used in MSP Integration Wizard to flag scheduling fields to be copied or not.
N=No
Y=Yes

Default Value: Y

79 PC_BUDGET_PERIODS Character(5) VARCHAR2(5) NOT NULL Budget periods
80 PC_SCH_FIELD1 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.

Prompt Table: GM_BUD_CATEGORY

81 PC_SCH_FIELD2 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
82 PC_SCH_FIELD3 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
83 PC_SCH_FIELD4 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
84 PC_SCH_FIELD5 Character(40) VARCHAR2(40) NOT NULL Generic field used for Projects Third Party Schedule Integration.
85 BUDGET_ITEM_LAB Character(15) VARCHAR2(15) NOT NULL Labor Budget Item
86 BUDGET_ITEM_MAT Character(15) VARCHAR2(15) NOT NULL Material Budget Item
87 COST_RATE_NAME Character(1) VARCHAR2(1) NOT NULL Named Resource Cost Rate Type
C=User Defined Rate
E=Employee Rate
J=Jobcode Rate
R=Project Role Rate
88 BILL_RATE_NAME Character(1) VARCHAR2(1) NOT NULL Named Resource Bill Rate Type
C=User Defined Rate
E=Employee Rate
J=Jobcode Rate
R=Project Role Rate
89 COST_RATE_GENERIC Character(1) VARCHAR2(1) NOT NULL Generic Resource Cost Rate Type
C=User Defined Rate
R=Project Role Rate
90 BILL_RATE_GENERIC Character(1) VARCHAR2(1) NOT NULL Generic Resource Bill Rate Type
C=User Defined Rate
R=Project Role Rate
91 CHARGING_LEVEL Character(1) VARCHAR2(1) NOT NULL Project Charging Level - identifies which level of the WBS activities are available for charging. 'D' indicates the detail level, which means all detail activities are available for charging. '1' indicates level 1 of the WBS is available for charging. '2' indicates level 2 of the WBS is available for charging. '3' indicates level 3 of the WBS is available for charging.
1=Costing Level 1
2=Costing Level 2
3=Costing Level 3
D=Detail
92 CHARGING_LEVEL_TR Character(1) VARCHAR2(1) NOT NULL Time Report Charging Level - identifies which level of the WBS activities are available for charging on time reports enter in Expenses. 'D' indicates the detail level, which means all detail activities are available for charging. '1' indicates level 1 of the WBS is available for charging. '2' indicates level 2 of the WBS is available for charging. '3' indicates level 3 of the WBS is available for charging.
1=Costing Level 1
2=Costing Level 2
3=Costing Level 3
D=Detail
93 AUTO_NAM_ASSIGN Character(1) VARCHAR2(1) NOT NULL Assign Named Resource

Y/N Table Edit

Default Value: N

94 AUTO_GEN_ASSIGN Character(1) VARCHAR2(1) NOT NULL Allocate Generic Resource

Y/N Table Edit

Default Value: N

95 ALLOW_OVERBOOK Character(1) VARCHAR2(1) NOT NULL Allow OverBooking

Y/N Table Edit

Default Value: N

96 REGION_CD Character(10) VARCHAR2(10) NOT NULL Identifies the Sales Region. Populated on the Item Table to identify the Sales Region the Item is applied to.

Prompt Table: RS_REGION_VW