Project Level Health

Project Level Health

# PeopleSoft Field Name PeopleSoft Field Type Database Column Type Description
1 BUSINESS_UNIT Character(5) VARCHAR2(5) NOT NULL Business Unit
2 PROJECT_ID Character(15) VARCHAR2(15) NOT NULL Project Id ChartField
3 PC_HEALTH_TYPE Character(1) VARCHAR2(1) NOT NULL Project Health Type
B=Budget
I=Issues
K=Risks
P=Project
R=Resources
S=Schedule
U=User Defined
4 PC_HEALTH_CALC Character(1) VARCHAR2(1) NOT NULL A flag that identifies whether Project Health will be calculated or entered manually.
C=Calculated
M=Manual Entry
5 PC_HEALTH Character(1) VARCHAR2(1) NOT NULL Calculated based on user-defined criteria, this field shows the overall health of a project.
F=Fair
G=Good
P=Poor
6 PC_HEALTH_DTTM DateTime(26) TIMESTAMP The datetime stamp of when Project Health was either calculated or manually entered.
7 ACT_OVRDUE_PCT Number(6,2) DECIMAL(5,2) NOT NULL Activity Overdue Percent
8 START_DT Date(10) DATE Start Date
9 END_DT Date(10) DATE End Date
10 PC_DURATION Number(11,2) DECIMAL(10,2) NOT NULL Duration
11 PERCENT_COMPLETE Number(6,2) DECIMAL(5,2) NOT NULL % Complete
12 PC_COST_VARIANCE Signed Number(28,3) DECIMAL(26,3) NOT NULL Cost Variance is the difference between actual costs and budgeted costs.
13 VARIANCE_PERCENT Signed Number(16,2) DECIMAL(14,2) NOT NULL Variance Percentage
14 PC_BUDGET_TOTAL Signed Number(28,3) DECIMAL(26,3) NOT NULL Project Budgeting: Budget Plan Total
15 PC_COST_AMOUNT Signed Number(28,3) DECIMAL(26,3) NOT NULL Total cost for a project.
16 OVRLOAD_PCT Number(6,2) DECIMAL(5,2) NOT NULL A field that stores Overload Percent
17 TOT_RESOURCE Number(8,0) INTEGER NOT NULL Total Number Of Resources
18 TOT_OVRLD_RES Number(8,0) INTEGER NOT NULL Total Overloaded Resources
19 PC_HIGH_ISS_PCT Number(6,2) DECIMAL(5,2) NOT NULL Project High Issues Percent
20 PC_ISS_HIGH Number(4,0) SMALLINT NOT NULL Number of High Issues
21 PC_ISS_MEDIUM Number(4,0) SMALLINT NOT NULL Number of Medium Issues
22 PC_ISS_LOW Number(4,0) SMALLINT NOT NULL Number of Low Issues
23 RISK_NO_PLAN_PCT Number(6,2) DECIMAL(5,2) NOT NULL Project High Issues Percent
24 RISKS_NO_PLAN Number(8,0) INTEGER NOT NULL Risks without Action Plan
25 RISKS_WITH_PLAN Number(8,0) INTEGER NOT NULL Risks with Action Plan
26 TOTAL_RISKS Number(8,0) INTEGER NOT NULL Total Risks